489 000 $
Object Description

Modern cottages in the heart of the center of Bukovel with an area of 170 and 190 m² and on land plots of 0.015 ha and 0.02 ha.
The houses offer a wonderful view of the village. Polyanytsia, GK "Bukovel", and surrounding mountains.
The cottages consist of two floors and a basement with an area of 20-40 m².
On the first floor there is a living room with a kitchen-studio, a bathroom and a corridor. On the second floor there are three bedrooms with separate bathrooms.
Buildings are built from ceramic blocks, on a monolithic foundation. The ceiling height is 3 m.
15 Kv of electricity is connected to each of the buildings. The type of heating is a heat pump (Mitsubishi).
Each cottage has its own terrace with a fireplace and parking. According to the project plan, a spa area and a swimming pool are being built, as well as paving to the main road.
The cottages are located in the very center of the Bukovel ski resort, the distance to the lift is 200m, so you can easily reach all centers of active recreation within walking distance.
Houses with designer repairs, fully furnished and with all the necessary household appliances. It is also possible to buy a house without repairs.
According to the investment plan of the developer's company, the payback of the house is from 5 to 7 years.

 

As of September 9, a contract has already been concluded with the management company Fomitch.
  In terms of external works, paving stones were laid in the upper rows, retaining walls were made,
the beginning of work on the installation of the lower part of the paving stones and the road near the houses.
Final works on the facade of buildings. The terraces of the lower row of houses are installed.
Regarding internal works - the upper row of buildings is being furnished and final repairs are being carried out, the upper row will be completed by October.
Repair work is underway in the lower row. The completion of the complex is planned for mid-November. And the launch of the complex from the beginning of December.
The spa area will be completed by the beginning of summer. At the moment, there are only 3 houses left.